![]() ![]() The static pile drivers enables installing piles to the designed depth without excavating. Performance The pile driving time depends on the type of soil and can reach 5-6 minutes. Minimum required space is 10x10 meters and the minimum distance to the neighbouring facility is 950 mm. Pressure control The static pile driver is anchored with metal weights to secure the continuous driving process which is important when evaluating the pile capacity during installation. ![]() Battle realms winter of the wolf trainer 11. The static pile driver is noise- and vibrationless and is suitable for all types of piles. ![]() Static pile drivers can be applied to installing concrete, and tube pipes of various sizes in restrained urban conditions, near shabby buildings, in historic centers and other areas where dynamic, vibrational and noise effects are unacceptable. Therefore, static pile drivers are an ideal solution. Pile driving works with the use of diesel pile hammers are not allowed in a range of cities in Russia. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |